Table of Contents
Introduction to the Project
The roof of this beautiful home in Franklin, Ohio was severely damaged by a recent hailstorm and strong winds, leaving the homeowner in need of immediate repairs. Working closely with Erie Insurance, we ensured a smooth and hassle-free claim process, so the homeowner only paid the deductible while the insurance covered the rest. After a detailed inspection, we replaced the damaged shingles and some of the underlying roof sheathing. For the new roof, we installed GAF Timberline HDZ shingles in a stylish Charcoal color, paired with TRI-BUILT synthetic underlayment for maximum protection. This project not only restored the home’s safety but also improved its overall appearance and durability.

Understanding the Damage
When the homeowner first contacted us, their roof had suffered significant damage from a recent hailstorm and high winds, which are common in Franklin, Ohio. Upon inspection, we discovered that the shingles were cracked and missing in several areas, leading to potential water infiltration issues. In addition to the damaged shingles, parts of the roof sheathing—the structural layer beneath the shingles—had also been compromised. This type of damage can worsen quickly if not addressed, leading to leaks and further deterioration of the roof structure. Understanding the extent of both the visible and hidden damage was essential to developing a comprehensive plan for the roof replacement. Our team thoroughly documented the damage to work with the homeowner’s Erie Insurance claim, ensuring all necessary repairs were covered.

Working with Erie Insurance
Navigating the insurance claim process can often feel overwhelming, but with our extensive experience, we made sure the homeowner’s journey with Erie Insurance was as smooth as possible. After completing a thorough inspection of the damage caused by hail and wind, we documented all the necessary repairs, including the compromised shingles and damaged roof sheathing. We worked directly with Erie Insurance to ensure they received detailed reports and photos, making it easy to get approval for the claim.

Thanks to Erie’s comprehensive coverage, the homeowner was responsible for only their deductible, while the rest of the project costs, including the materials and labor for the roof replacement, were covered. The insurance approval process was quick and efficient, allowing us to start the roof replacement without delay. This seamless process provided peace of mind to the homeowner, knowing that the insurance company and our team were handling all the details.
Initial Removal & Sheathing Replacement
The first step in this roof replacement project was the careful removal of the existing, damaged shingles. Our team started by stripping away the old shingles that had been battered by the hail and wind. During the removal process, we uncovered areas of the roof sheathing that were significantly damaged beneath the surface. This was expected, as extreme weather often compromises not only the visible parts of a roof but also the underlying structure.

Once the old shingles were removed, we inspected the roof sheathing—the wooden boards that form the foundation of the roof structure. In this case, sections of the sheathing had deteriorated due to water infiltration from the damaged shingles. Replacing these sections was crucial to ensuring the long-term stability and safety of the roof. We removed the compromised sheathing and installed new, durable wood panels to provide a strong, secure base for the new shingles.

This process is essential in any quality roof replacement. Installing new shingles over damaged sheathing could lead to leaks and structural issues down the line. By addressing this problem upfront, we ensured that the homeowner’s roof would remain solid and leak-free for years to come.
GAF Timberline HDZ Shingles (Charcoal)
For this roof replacement in Franklin, Ohio, we chose GAF Timberline HDZ shingles, one of the most trusted products in the roofing industry. These shingles are known for their durability, high wind resistance, and stylish appearance. The homeowner selected the Charcoal color, which complemented the home’s brick exterior beautifully, adding a modern yet timeless look to the property.
One of the standout features of the GAF Timberline HDZ shingles is their ability to withstand winds of up to 130 mph, making them ideal for regions like Ohio, where severe weather is a common concern. Additionally, these shingles come with a lifetime warranty, providing the homeowner with peace of mind knowing that their roof is protected for the long term.

Beyond their functional benefits, the LayerLock™ technology used in GAF Timberline HDZ shingles ensures perfect alignment and enhanced strength when installed. This innovative technology guarantees that each shingle locks tightly into place, improving the roof’s overall durability and appearance. The wide nailing zone also makes for a quicker, more precise installation process, ensuring a smooth and secure fit across the entire roof.
Choosing these premium shingles not only ensures superior performance in harsh weather conditions but also enhances the home’s curb appeal. The Charcoal color provides a sleek, clean finish that will maintain its aesthetic appeal for years without fading or wear.
TRI-BUILT Synthetic Underlayment
In addition to the high-quality GAF Timberline HDZ shingles, we used TRI-BUILT synthetic underlayment for this roof replacement project in Franklin, Ohio. TRI-BUILT underlayment is a premium roofing material designed to provide an extra layer of protection beneath the shingles. Unlike traditional felt underlayment, TRI-BUILT synthetic underlayment is much more durable, offering superior resistance to moisture and other weather-related damage.

One of the key benefits of TRI-BUILT synthetic underlayment is its waterproofing capabilities. This product creates a highly effective moisture barrier that protects the roof deck from leaks and water infiltration, especially during the unpredictable weather conditions that are common in Ohio. With the added defense from the TRI-BUILT underlayment, the new roof is not only more resistant to rain but also better equipped to handle ice dams and snow build-up during winter months.
Another major advantage is the lightweight yet high-strength construction of this underlayment. Its synthetic materials make it easy to install while ensuring the roof remains well-protected. The product’s resistance to tearing and its slip-resistant surface also make it safer and more efficient for roofers to work with, contributing to a quicker, smoother installation process.
By choosing TRI-BUILT synthetic underlayment, the homeowner gains a long-lasting, protective layer that ensures the GAF Timberline HDZ shingles perform at their best. This combination of high-performance shingles and underlayment will keep the home safe from moisture-related issues, extending the overall lifespan of the roof and providing reliable protection for years to come.
Step-by-Step Roof Installation
The roof installation process for this Franklin, Ohio home was executed with precision and care, ensuring the highest quality result. Here’s a step-by-step breakdown of how we replaced the damaged roof, installed new materials, and completed the project:

Step 1: Removing the Old Shingles
The first step was to carefully remove the old, damaged shingles that had been compromised by hail and wind. Our team worked efficiently to strip the roof down to the bare sheathing, allowing us to inspect the underlying structure for any signs of damage. This step was crucial in preparing a clean surface for the new installation.

Step 2: Inspecting and Replacing Roof Sheathing
Once the shingles were removed, we inspected the roof sheathing for any additional damage. Several sections had sustained water damage from prolonged exposure to the elements, so we replaced those sections with new, sturdy sheathing to ensure a solid foundation for the roof.

Step 3: Laying the TRI-BUILT Synthetic Underlayment
Next, we installed the TRI-BUILT synthetic underlayment, a high-quality moisture barrier designed to protect the roof from water infiltration. The underlayment was rolled out and fastened securely to the roof deck, providing an extra layer of protection between the roof sheathing and the new shingles. This step ensures the roof is well-equipped to handle rain, snow, and ice, preventing leaks and moisture buildup.

Step 4: Installing GAF Timberline HDZ Shingles
With the underlayment in place, we began installing the GAF Timberline HDZ shingles in the Charcoal color chosen by the homeowner. These shingles, known for their durability and high wind resistance, were installed using LayerLock™ technology to ensure perfect alignment and maximum adhesion. The wide nailing zone of these shingles allowed for a quicker and more secure installation.

Step 5: Securing Roof Vents and Flashing
Proper ventilation is crucial for any roof, so we carefully installed and sealed the roof vents to ensure the attic space would remain well-ventilated, preventing moisture buildup and extending the lifespan of the roof. We also installed new flashing around chimneys and vents to further guard against water infiltration in these vulnerable areas.

Step 6: Final Quality Check and Cleanup
Once the shingles and ventilation were in place, we conducted a thorough quality check to ensure every aspect of the roof was installed correctly. We inspected the alignment of the shingles, the tightness of the seals, and the overall structural integrity of the roof. After completing the inspection, we cleaned up the job site, removing all debris and leftover materials to leave the property in pristine condition.
The result was a beautiful, durable roof that will provide long-lasting protection for the homeowner. By following this detailed installation process, we ensured that the roof is not only weather-resistant but also aesthetically pleasing, with the Charcoal shingles adding a modern touch to the home’s exterior.
Smooth Insurance Process with Erie Insurance
One of the most important aspects of this roof replacement project was ensuring the homeowner had a smooth and stress-free experience with their insurance claim. Fortunately, Erie Insurance made this process seamless. From the moment the damage was reported, we worked directly with the homeowner and Erie to ensure the claim covered all necessary repairs caused by hail and wind damage.
We began by providing detailed documentation of the damage, including photos of the affected shingles and roof sheathing, as well as an itemized estimate of the required repairs. Thanks to our long-standing relationship with Erie Insurance, we were able to expedite the approval process. Erie’s adjusters were thorough yet efficient in reviewing the claim, and within a short time, the claim was approved.
The best part for the homeowner was that Erie Insurance covered the entire cost of the roof replacement, apart from the deductible. This meant that the homeowner didn’t have to worry about unexpected out-of-pocket expenses for the project. By handling all communication and paperwork with Erie Insurance on behalf of the homeowner, we ensured they had peace of mind throughout the process.
This smooth collaboration between our team and Erie Insurance allowed us to start the roof replacement quickly, minimizing any delays. The homeowner was relieved to know that their new roof, featuring high-quality materials like GAF Timberline HDZ shingles and TRI-BUILT synthetic underlayment, was fully covered and would provide durable protection for years to come.
Final Look of the New Roof

The final look of the new roof was nothing short of impressive. The GAF Timberline HDZ shingles in the sleek Charcoal color gave the home a modern and elegant appearance, perfectly complementing the home’s exterior. The uniform installation and clean lines created a visually appealing result, instantly boosting the home’s curb appeal.
Beyond aesthetics, the roof now offers superior protection against the elements, especially with the added layer of TRI-BUILT synthetic underlayment beneath the shingles. The combination of high-quality materials and professional installation ensures that the homeowner will enjoy both long-lasting durability and a fresh, updated look for years to come.

The before-and-after transformation is remarkable. The previous roof, damaged by hail and wind, had visible wear and tear, while the new roof not only restored the home’s structural integrity but also enhanced its overall appearance. The homeowner was thrilled with the final outcome, knowing they had a roof that not only looked great but would withstand Ohio’s weather challenges.
Long-Term Durability
The new roof, featuring GAF Timberline HDZ shingles and TRI-BUILT synthetic underlayment, is designed for long-term durability, providing the homeowner with peace of mind for many years to come. The GAF Timberline HDZ shingles are engineered to resist winds up to 130 mph, making them perfect for Ohio’s unpredictable weather conditions, including storms and high winds. Additionally, the TRI-BUILT underlayment offers an extra layer of protection against moisture, ensuring the roof stays watertight even in heavy rain or snow.
The combination of these premium materials means the roof is not only visually appealing but also built to last. With the lifetime warranty that comes with GAF shingles, the homeowner is covered in case of any future issues, adding an extra layer of security to their investment.
Moreover, the advanced LayerLock™ technology used in the shingles ensures proper alignment and a tight seal, reducing the risk of water infiltration or shingle displacement over time. This guarantees that the roof will maintain its structural integrity and continue to protect the home for decades, reducing the need for frequent maintenance or repairs.
Overall, this roof replacement provides a long-lasting solution that will shield the home from the elements while maintaining its aesthetic appeal and structural soundness well into the future.
FAQs
The time it takes to replace a roof typically depends on the size of the roof and weather conditions. For a standard-sized home in Franklin, Ohio, a roof replacement can take 1-2 days. This includes removing old shingles, replacing any damaged sheathing, and installing new shingles and underlayment.
In most cases, homeowners’ insurance will cover roof damage caused by storms, such as hail or wind, which was the case with this project. With Erie Insurance, the homeowner only paid the deductible, while the rest of the cost was covered by the insurance claim.
GAF Timberline HDZ shingles are highly durable, offering protection from winds up to 130 mph. They come with a lifetime warranty and use LayerLock™ technology for enhanced performance and proper alignment, ensuring long-lasting protection and a beautiful finish.
TRI-BUILT synthetic underlayment is stronger and more durable than traditional felt. It provides superior waterproofing and tear resistance, protecting the roof from moisture and extending the lifespan of the shingles.